SCHEDULING PROBLEMS FOR JOBS AND DIFFERENT MACHINES WITH MAKE SPAN CRITERION AND LEFT TIME ALIGNMENT

  • Daniel Rezmires S.C. SIRCA S.A, Piatra Neamt
  • Alfredo Monfardini RIMA Spa, Italy
  • Cezar Racocea "Gheorghe Asachi" Technical University of Iasi
Keywords: scheduling, make span, left time alignment, Gantt, CIM, FMS

Abstract

This paper focuses on operations scheduling, which involves assigning jobs to workstations or employees to jobs for specified time period. The scheduling techniques we discuss in this paper are similar with Gantt method type and serv various process types in manufacturing process. There are companies which have to deliver many types of different products in a specified time, as, for example, a slewing ring factory, which has to sell a large variety of products (taking into account dimensions and configurations), in the same time.

Published
2014-09-11
How to Cite
Rezmires, D., Monfardini, A., & Racocea, C. (2014). SCHEDULING PROBLEMS FOR JOBS AND DIFFERENT MACHINES WITH MAKE SPAN CRITERION AND LEFT TIME ALIGNMENT. Mechanical Testing and Diagnosis, 4(3), 13-20. Retrieved from https://gup.ugal.ro/ugaljournals/index.php/mtd/article/view/2384
Section
Articles

Most read articles by the same author(s)

Obs.: This plugin requires at least one statistics/report plugin to be enabled. If your statistics plugins provide more than one metric then please also select a main metric on the admin's site settings page and/or on the journal manager's settings pages.